Stop renting your power.

Commercial PV that fixes your kWh cost for 25 years and delivers a payback inside 5.

Request engineered proposal

Commercial system tiers

All tiers ship with high-voltage hybrid inverters, LiFePO₄ storage and Tier-1 PV. Sized in modular blocks of 30kW + 61.44kWh.

SA tariff preset

SME Starter

Small workshops, retail, professional offices.

30 kW+ 61.44 kWh
from R 14,995.00 p/m
  • 30kW HV Hybrid Inverter
  • 61.44kWh LiFePO₄ Battery Bank
  • 36 × 610W JA / Jinko Tier 1 Panels
  • Load-shedding immunity
  • Online monitoring + remote support
Inverter30kW SigenStor High-Voltage Hybrid (3-Phase)
Battery61.44 kWh usable (HV stack)
ChemistryLithium Iron Phosphate (LiFePO₄)
Panels36 × 610 W JA / Jinko Tier 1
Phase3-Phase
Avg monthly kWh6,500 kWh
Assumptions
  • Avg monthly kWh: 6,500
  • Usable battery: 32.0 kWh
  • Panel basis: 36 × 610 W JA / Jinko Tier 1
  • PSH 5.5 · Day/Night 50/50 · Esc 15%/yr
ROI @ R3.75/kWh
Monthly
R 13 706
Payback
2.6y
25-yr
R 32 107 347
Inputs inconsistent
  • Usable battery (32.0 kWh) covers <40% of nightly load (108.3 kWh).
Best value

Business Growth

Small factories, guesthouses, supermarkets.

50 kW+ 108 kWh
from R 24,995.00 p/m
  • 50kW HV Hybrid Inverter
  • 108kWh LiFePO₄ Battery Bank
  • 66 × 610W JA / Jinko Tier 1 Panels
  • Generator integration
  • SANS 10142 + COC included
Inverter50kW Sungrow High-Voltage Hybrid (3-Phase)
Battery108 kWh usable (SigenStack HV)
ChemistryLithium Iron Phosphate (LiFePO₄)
Panels66 × 610 W JA / Jinko Tier 1
Phase3-Phase
Avg monthly kWh12,000 kWh
Assumptions
  • Avg monthly kWh: 12,000
  • Usable battery: 66.5 kWh
  • Panel basis: 66 × 610 W JA / Jinko Tier 1
  • PSH 5.5 · Day/Night 50/50 · Esc 15%/yr
ROI @ R3.75/kWh
Monthly
R 25 135
Payback
2.2y
25-yr
R 58 881 863
Inputs inconsistent
  • Usable battery (66.5 kWh) covers <40% of nightly load (200.0 kWh).

Industrial

Cold-chain, light manufacturing, large retail.

100 kW+ 216 kWh
from R 47,995.00 p/m
  • 100kW HV Hybrid Inverter
  • 216kWh LiFePO₄ Battery Bank
  • 120 × 610W JA / Jinko Tier 1 Panels
  • SCADA + utility-grade monitoring
  • Hour-by-hour load simulation
Inverter100kW Sungrow High-Voltage Hybrid (3-Phase)
Battery216 kWh usable (2 × SigenStack HV)
ChemistryLithium Iron Phosphate (LiFePO₄)
Panels120 × 610 W JA / Jinko Tier 1
Phase3-Phase
Avg monthly kWh24,000 kWh
Assumptions
  • Avg monthly kWh: 24,000
  • Usable battery: 160.0 kWh
  • Panel basis: 120 × 610 W JA / Jinko Tier 1
  • PSH 5.5 · Day/Night 50/50 · Esc 15%/yr
ROI @ R3.75/kWh
Monthly
R 45 905
Payback
3.0y
25-yr
R 107 195 787

Enterprise

Factories, agri-processing, logistics hubs.

200 kW+ 432 kWh
from R 92,995.00 p/m
  • 200kW HV Hybrid Inverter Stack
  • 432kWh LiFePO₄ Battery Bank
  • 240 × 610W JA / Jinko Tier 1 Panels
  • Peak-shaving + demand response
  • Dedicated key-account engineer
Inverter2 × 100kW Sungrow HV Hybrid (3-Phase, parallel)
Battery432 kWh usable (4 × SigenStack HV)
ChemistryLithium Iron Phosphate (LiFePO₄)
Panels240 × 610 W JA / Jinko Tier 1
Phase3-Phase
Avg monthly kWh48,000 kWh
Assumptions
  • Avg monthly kWh: 48,000
  • Usable battery: 160.0 kWh
  • Panel basis: 240 × 610 W JA / Jinko Tier 1
  • PSH 5.5 · Day/Night 50/50 · Esc 15%/yr
ROI @ R3.75/kWh
Monthly
R 91 811
Payback
2.1y
25-yr
R 214 391 574
Inputs inconsistent
  • PV array (146.4 kWp) exceeds 1.6× inverter rating (80 kW).
  • Usable battery (160.0 kWh) covers <40% of nightly load (800.0 kWh).

25-year cumulative savings — all tiers

Tariff R3.75 · 15%/yr escalation

Monthly savings vs load

Year-1, per tier

Interactive analytics

Live analytics — SME Starter

Tariff R3.75/kWh · 15%/yr escalation · 25-year horizon

Net cashflow & payback tracker

Payback ≈ year 2.6

Monthly solar production (Year 1)

44,115 kWh / year

Solar vs grid — monthly energy mix

Stacked monthly kWh

System cost breakdown

CAPEX (incl VAT): R 475 433

Annual CO₂ offset

25-year total ≈ 987 tonnes

Grid tariff escalation curve

R3.75 → R107.34 over 25 yrs

Commercial Portfolio

Engineered, Installed, Producing.

A snapshot of commercial PV systems we've designed and commissioned across South Africa — from retail centres and factories to agri-processing and hospitality.

Birch Acres Square — Retail Centre solar PV installation in Kempton Park, Gauteng
Retail Centre
Birch Acres Square
Kempton Park, Gauteng
Spar Beacon Bay — Supermarket solar PV installation in East London, EC
Supermarket
Spar Beacon Bay
East London, EC
PG Glass Manufacturing — Industrial / Factory solar PV installation in Gauteng
Industrial / Factory
PG Glass Manufacturing
Gauteng
Chelsea Pies — Food Production solar PV installation in Johannesburg
Food Production
Chelsea Pies
Johannesburg
Palm Springs, Cosmo City — Residential Estate solar PV installation in Johannesburg
Residential Estate
Palm Springs, Cosmo City
Johannesburg
Cayley Mountain Resort — Hospitality / Resort solar PV installation in KwaZulu-Natal
Hospitality / Resort
Cayley Mountain Resort
KwaZulu-Natal
Broiler Farm — Array A — Agriculture / Poultry solar PV installation in North West
Agriculture / Poultry
Broiler Farm — Array A
North West
Broiler Farm — Array B — Agriculture / Poultry solar PV installation in Limpopo
Agriculture / Poultry
Broiler Farm — Array B
Limpopo
Ground-Mount Agri Array — Agriculture solar PV installation in Western Cape
Agriculture
Ground-Mount Agri Array
Western Cape
Primary School Rooftop PV — Education / Schools solar PV installation in Durban, KZN
Education / Schools
Primary School Rooftop PV
Durban, KZN

Per-tier ROI breakdown

Year-1 savings, payback, ROI % and 25-year cashflow. Same tariff & escalation as the cards above and the Compare Tiers download — single source of truth.

TierAvg kWh/moCAPEX (incl VAT)Monthly savings (Y1)Payback25-yr savingsROI % (25 yr)Y1 → Y25 cashflow
SME Starter6,500R 475 433R 13 7062.6 yrsR 32 107 3476753%Y1 R 164 472 · Y10 R 554 204 · Y25 R 4 198 121
Business Growth12,000R 714 403R 25 1352.2 yrsR 58 881 8638242%Y1 R 301 625 · Y10 R 1 016 371 · Y25 R 7 697 684
Industrial24,000R 1 939 935R 45 9053.0 yrsR 107 195 7875526%Y1 R 550 864 · Y10 R 1 854 315 · Y25 R 13 995 788
Enterprise48,000R 2 553 345R 91 8112.1 yrsR 214 391 5748396%Y1 R 1 101 729 · Y10 R 3 708 630 · Y25 R 27 991 577

Commercial electricity load analysis

Edit appliance quantities and run-hours. Rows turn amber when they trip a system limit (duplicate, zero hours, exceed inverter peak, or exceed nightly battery cover).

1 validation issue(s) — checked against SME Starter (30kW inverter, 32kWh usable battery)
  • Estimated nightly load 79.1 kWh exceeds usable battery (32.0 kWh). Add storage or shift load to daytime.
ApplianceCategoryQtyWattsHrs/daykWh/daykWh/month
LED Tube Light (4 ft)
Lighting4.0120
LED High-Bay (warehouse)
Lighting9.0270
12,000 BTU Split AC
Heavy contributor to night load
HVAC35.21056
24,000 BTU Split AC
Heavy contributor to night load
HVAC35.21056
Industrial Extractor Fan
HVAC8.0240
Commercial Fridge
Refrigeration16.8504
Chest Freezer
Refrigeration7.2216
Cold Room (small)
Refrigeration0.00
Electric Geyser (200 L)
Cooking9.0270
Kettle / Urn
Cooking4.0120
Microwave
Cooking1.030
Commercial Oven
Cooking0.00
Desktop PC + Monitor
Heavy contributor to night load
Office18.0540
Laser Printer
Office2.060
Router / Switch / PoE
Office2.986
Water Pump (1.5 kW)
Motors6.0180
Air Compressor (2.2 kW)
Motors0.00
CNC / Workshop Tool
Motors0.00
Total158.3 kWh/day4748 kWh/month

Load split by category

Monthly kWh share

Peak demand24.5 kW
Est. nightly load79.1 kWh
Active inverter30 kW
Active battery (usable)32.0 kWh
Map total load into a tier's calculator default

Overrides the tier's avg monthly kWh used by ROI cards, the breakdown table and the Compare Tiers CSV.

Scenario compare

Save multiple appliance-load mappings and see ROI deltas vs each tier's default. Use the "Save as scenario" button above after editing the load sheet.

No scenarios saved yet. Edit the load sheet, pick a tier and click Save as scenario.

What you get.

Every commercial proposal includes a 25-year cashflow, full BoM, single-line diagram and SANS-compliant design pack.

  • Engineered ROI
    Modeled IRR, NPV and payback under SA tariff escalation.
  • Generation vs load
    Hour-by-hour simulation against your actual demand.
  • Compliance & warranty
    SANS 10142, COC certificate, full multi-brand warranties.
Sample proposal — 100 kWp
System size (PV)120 kWp (120% oversize)
Inverter capacity100 kW Sunsynk MAX
Battery215 kWh BYD HVM
Annual yield≈ 245,000 kWh
25-year savingsR 14.8m
Payback4.6 years
IRR (25 yr)23.4%